Abengoa is a world leader in both technological and installed capacity in solar thernmal technogy.its offer in this field includes technological advice,engineering services,EPC,consulting,component developing(solar field)or O&M services.
阿本戈是光热太阳能技术方面在技术和装机容量的全球领导者,在该领域提供包括技术咨询,设计服务,EPC,咨询,组件开发(镜场)或运维服务。
Abengoa develops the two most widely used commercial solar thermal technologies:
阿本戈开发了2中最为广泛运用的商用光热太阳能技术:
Tower:Abengoa is a pioneer in the construction of tower plants for commetcial operation,with more than 80MW in operation and 11MW under construction.
塔式:阿本戈是建设商业运营的塔式电厂的先驱,现运营超过80MW,在建110MW。
Parabolic trough:Abengoa is a pioneer in the construction of this type of plants with more than 1600MW in operation.
槽式:阿本戈是建设此类电厂的先驱,现运营1超过600MW。
main references:
主要业绩:
Project | Location | Capacity | Current Ownership | Developer | EPC | O&M | Commercial Operation Date |
Chile | 110 MW | Cerro Dominador CSP SA | Cerro Dominador CSP SA | Abengoa/Acciona | Abengoa | Under construction | |
DEWA | UAE | 600 MW | DEWA | Abengoa | Abengoa | Abengoa | Under construction |
WAS (solar field) | Saudí Arabia | 50 MW | Saudi Electric Company | Abengoa and General Eectric | Abengoa and General Eectric | Abengoa | Under construction |
South Africa | 100 MW | Abengoa, IDC, PIC and Xina Community Trust | Abengoa | Abengoa | Abengoa | August 2017 | |
Khi Solar One | South Africa | 100 MW | Abengoa, IDC and Khi Community Trust | Abengoa | Abengoa | Abengoa | March 2016 |
Kaxu Solar One | South Africa | 100 MW | Atlantica Yield, IDC and Kaxu Community Trust | Abengoa | Abengoa | Abengoa | February 2015 |
Mojave | USA | 280 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | December 2014 |
Shams 1 | UAE | 100 MW | Masdar and Total | Tender by Masdar, UAE | Abengoa | Initially JV Total and Abengoa; currently JV of Total and Masdar | September 2013 |
Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | August 2013 | |
Solaben 6 | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | August 2013 |
United States | 280 MW | Atlantica Yield and Liberty Interactive Corporation | Abengoa | Abengoa | Abengoa Mojave Solar | October 2013 | |
Helios II | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | June 2012 |
Solaben 2 | Spain | 50 MW | Atlantica Yield and Itochu | Abengoa | Abengoa | Abengoa | June 2012 |
Solaben 3 | Spain | 50 MW | Atlantica Yield and Itochu | Abengoa | Abengoa | Abengoa | April 2012 |
Helios I | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | March 2012 |
Solacor 2 | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | Februar 2012 |
Solacor 1 | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | January 2012 |
Helioenergy 2 | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | October 2011 |
Helioenergy 1 | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | August 2011 |
Solnova 4 | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | July 2010 |
Hassi R'Mel | Algeria | 130 CC + 20 Solarp | Abengoa, NEAL and Sonatrach | Abengoa | Abengoa | Abengoa S.A. | May 2010 |
Solnova 3 | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | May 2010 |
Solnova 1 | Spain | 50 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | April 2010 |
Spain | 20 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | April 2009 | |
Torre Eureka | Spain | 2 MW | Abengoa Solar New Technologies | Abengoa | Abengoa | Abengoa | 2009 |
PS10 | Spain | 11 MW | Atlantica Yield | Abengoa | Abengoa | Abengoa | June 2007 |
供货项目 | 供货量 | 供货完成时间 | 项目简介 | 备注 |